Estimating metric TSP cost below factor 2 with sublinear queries

Estimate the shortest tour of an n-point metric within a factor below 2 from o(n²) distance queries, or show it cannot be done.

main — 默认分支还没有路线
036b4a8
2 个分支
代码
README.md

Estimating metric TSP cost below factor 2 with sublinear queries

Given an oracle for the distances between nn points of a metric space, the length of the shortest tour through them can be estimated within a factor 2+ε2+\varepsilon from about nn queries, by estimating the weight of a minimum spanning tree. Nobody knows how to beat the factor 2 without reading essentially all n2n^2 distances, or whether it is possible at all.

Problem

Let (X,d)(X, d) be a metric space on nn points, accessed through an oracle that returns d(x,y)d(x,y) for a queried pair. Let TSP(X)\mathrm{TSP}(X) be the length of a shortest tour, a cycle visiting every point once.

Question. Is there an absolute constant δ>0\delta > 0 and a randomized algorithm that, for every nn-point metric, makes o(n2)o(n^2) distance queries and with probability at least 2/32/3 outputs an estimate T^\widehat T with

TSP(X)≤T^≤(2−δ) TSP(X)?\mathrm{TSP}(X) \le \widehat T \le (2-\delta)\,\mathrm{TSP}(X)?

The stronger version asks for o(n2)o(n^2) running time. Only the value is needed, not a tour.

Background

The weight of a minimum spanning tree MST(X)\mathrm{MST}(X) satisfies MST(X)≤TSP(X)≤2 MST(X)\mathrm{MST}(X) \le \mathrm{TSP}(X) \le 2\,\mathrm{MST}(X), and Czumaj and Sohler showed how to estimate it within 1+ε1+\varepsilon in O~(n)⋅poly(1/ε)\tilde O(n)\cdot\mathrm{poly}(1/\varepsilon) time [1], which gives factor 2+ε2+\varepsilon for the tour. Classical algorithms that do better, such as Christofides', start from an actual minimum spanning tree, but finding even a constant-factor approximate spanning tree requires Ω(n2)\Omega(n^2) queries [1]. Krzysztof Onak posed the question at the 2016 Sublinear Algorithms Workshop at Johns Hopkins University, and Chen, Khanna and Tan still call it a major open problem of the query model [3].

What is known

  • Graphic metrics, shortest-path distances of a connected unweighted graph: Chen, Kannan and Khanna (ICALP 2020) gave the first estimate below 2, within 2−ε02-\varepsilon_0 for a fixed ε0>0\varepsilon_0 > 0 in O~(n)\tilde O(n) time, and within 27/1427/14 in O~(n1.5)\tilde O(n^{1.5}) time [2]. Behnezhad, Roghani, Rubinstein and Saberi (ICALP 2024) improved this to 1.831.83 in O~(n)\tilde O(n) time and 1.661.66 in n2−Ω(1)n^{2-\Omega(1)} time [5].
  • (1,2)-metrics, where every distance is 1 or 2: factor 1.6251.625 in O~(n1.5)\tilde O(n^{1.5}) time [2], then 1.5+ε1.5+\varepsilon in O~(n)\tilde O(n) time [5], which supersedes the 1.751.75 factor mentioned on the source page. Going further in near-linear time would require better sublinear algorithms for maximum matching [5]. An unrefereed 2026 preprint gives 1.4132…+ε1.4132\ldots+\varepsilon in n2−Ωε(1)n^{2-\Omega_\varepsilon(1)} time (Alipour and Nowzari) [4].
  • Limits. For graphic and (1,2)-metrics, a (1+ε0)(1+\varepsilon_0)-estimate for some constant ε0>0\varepsilon_0 > 0 needs Ω(n2)\Omega(n^2) queries, and estimating these tours is tied to estimating maximum matching size [2].
  • General metrics. Chen, Khanna and Tan (ICALP 2023) beat factor 2 with O~(n1.5)\tilde O(n^{1.5}) queries when the metric contains a spanning tree of distance-1 edges or the algorithm is given a minimum spanning tree [3]. Without such help, no o(n2)o(n^2)-query algorithm better than 2 is known [2, 3].

What would count as progress

  • An algorithm with o(n2)o(n^2) queries and a proof that it estimates every metric's tour within 2−δ2-\delta. Its estimates can be compared against exact or near-optimal tour lengths on benchmark instances as a sanity check.
  • A proof that every (2−δ)(2-\delta)-estimator needs Ω(n2)\Omega(n^2) queries, for instance from two distributions over metrics whose tour lengths differ by a factor near 2 but which look alike to few queries.
  • A factor below 2 with o(n2)o(n^2) queries for a broader class of metrics than those handled in [2, 3, 5].

References

  1. A. Czumaj and C. Sohler, Estimating the weight of metric minimum spanning trees in sublinear time, SIAM J. Comput. 39(3) (2009), 904–922. doi:10.1137/060672121
  2. Y. Chen, S. Kannan and S. Khanna, Sublinear algorithms and lower bounds for metric TSP cost estimation, ICALP 2020. doi:10.4230/LIPIcs.ICALP.2020.30
  3. Y. Chen, S. Khanna and Z. Tan, Sublinear algorithms and lower bounds for estimating MST and TSP cost in general metrics, ICALP 2023. doi:10.4230/LIPIcs.ICALP.2023.37
  4. S. Alipour and A. Nowzari, Sublinear-time and semi-streaming algorithms for path cover and TSP, preprint (2026). arXiv:2610.18701
  5. S. Behnezhad, M. Roghani, A. Rubinstein and A. Saberi, Sublinear algorithms for TSP via path covers, ICALP 2024, LIPIcs 297, 19. doi:10.4230/LIPIcs.ICALP.2024.19

Source